Exclusive discounts on top software products!

P6 Lifetime One Drive Send Download Link Stand-alone Engineering Project Management Software Orac Primavera P6- For win only

£44.99£39.99

Out of stock

P6 was originally the abbreviation of Primavera 6.0 for windows only. (officially released globally on July 1, 2007), a project management software developed by Primavera System Inc. in the United States, and the latest registered trademark of Primavera's project management software series. It was acquired by ORACLE in 2008. External unified called Oracle Primavera P6.

Operating System: Windows

Software Description: Oracle Primavera P6 EPPM integrates the project management essence and experience of P3 software for 20 years, adopts the latest IT technology, and builds enterprise-level, modern project management knowledge system on the large-scale relational database Oracle and MS SQL Server, and has a high degree of flexibility. The enterprise-level engineering project management software, which is flexible and open, with planning-coordination-tracking-control-accumulation as the main line, is a classic work of project management theory evolving into practical technology. P3 can only manage a single large-scale project, while using the latest version of P6 software enables enterprises to budget for multiple projects, determine project priorities, and optimize limited and shared resources (including people, materials, machines, etc.). Develop project plans and manage multiple projects. It can provide a wide range of information to all management levels of the enterprise, and all management levels can analyze, record and communicate this reliable information and make timely and well-founded decisions that meet the company's goals. P6 includes a set of software for enterprise-level project management that can manage projects in different locations across disciplines, departments, and at different levels of the enterprise at the same time. Oracle Primavera P6 is a comprehensive project portfolio management (PPM) solution that includes a variety of role-specific tools to meet the needs, responsibilities and skills of each team member. The P6 suite features a standard Windows interface, client/server architecture, web-enabled technology, and standalone (Oracle XE) or web-based (Oracle and Microsoft SQL Server) databases. Oracle Primavera P6 Suite includes the following software components: Project Management (PM) The Project Management module allows users to track and analyze performance. This module is a multi-user, multi-project system with schedule scheduling and resource control functions, supporting multi-layer project hierarchies, role- and skill-oriented resource scheduling, recording actual data, custom views, and custom data. This module is ideal for organizations that need to manage multiple projects simultaneously within a department or across the organization and support multi-user access. It supports Enterprise Project Structure (EPS) with unlimited number of projects, activities, goal plans, resources, Work Breakdown Structure (WBS), Organizational Breakdown Structure (OBS), Custom Defined Codes, Critical Path Method (CPM) Calculate and balance resources. Implementing project portfolio management at scale across the enterprise requires the use of Oracle or SQL Server as the project database. For small-scale applications, SQL Server Express can be used. The PM module also provides centralized resource management. This includes resource timesheet approvals and the ability to communicate with project resource departments using the Progress Reporter module. In addition, the module provides integrated risk management, issue tracking and threshold management. Tracking allows users to perform dynamic cross-project cost, progress and earned value aggregation. Project work products and documents can be assigned to activities and managed centrally. The Report Wizard creates custom reports that extract specific data from its database. Software advantages: Powerful schedule management Progress is one of the core elements of project management and a core business that managers are very concerned about. The quality of schedule management is directly related to whether the project can be completed on time and whether the project cost is within the budget. It mainly includes construction schedule management, design delivery schedule, equipment delivery, installation and commissioning schedule, related drawings and data submission schedule, and resource cost optimization balance, among which schedule management is the most important. Design delivery, equipment delivery and installation, and submission of drawings and materials can also be regarded as a project, and its schedule management is similar to construction schedule management in terms of management ideas and management methods. Strong resource and cost management With the continuous reduction of the average profit rate of engineering projects, strengthening the cost control in the construction process is increasingly valued by enterprises. The management of resources and expenses has always been a strong point of P6. The addition of roles and the addition of resource classification codes makes the entire management capability even more powerful. In addition, the use of P6 software can make users have a broader perspective on cost management; allow users to manage investment and income, and the return on investment is always under control. Primavera was acquired by Oracle (Oracle) in October 2008. The latest product name is Oracle Primavera P6. The full name of P6 is Oracle Primavera P6, which is fully taken over by Oracle (Oracle) and incorporated into the sales system. Version In December 2017, the latest version is Oracle Primavera P6 R17.12. On April 15, 2013, the latest version is Oracle Primavera P6 R8.3. In June 2011, the latest version is Oracle P6 R8.1, some of the original R8 A lot of improvements have been made to the problem, and resource management, risk management functions, and data reporting functions have been enhanced. Different from R8, R8.1 can be installed on the MS SQl database. P6 R8 has made a more detailed division of the project management role in the original P6 design structure. Software management and deployment must be carried out on the BS structure, and BS reports and CS reports also belong to different report databases. In the P6 Professional software template (CS structure) of P6 R8, there is a big difference between the operation and the previous version of the PM template.

Standalone version for lifetime use

No key - No license 

Shipping

SHIPPING BY Onedriver/ EMAIL Only. 

Digital delivery only! Your product will be sent to your email — nothing will be posted.

If you have any questions or need more information, don’t hesitate to get in touch.

No allow refund once shipping